Workmen are still required in paving roads with these fancy machines. This crew mans the “lay-down” machine and assures an even thickness of the asphalt coating. The hot asphalt can melt the soles of the men’s boots if they stay in one pace to long. The N.M. 4 job will require two coats of material to form the finished roadway. Each coat appears to be about 2 to 3 inches thick. Photo by TK Thompson/ladailypost.com
This “shuttle buggy” picks up a load of fresh asphalt hot mix that has just been dumped in a ribbon onto the roadway by a bottom-dump semi truck this past week Read More




Atomic Tumblers Ramya Stevens, Jenna Weatherbie, Katya Skurikhin, Elyse Phillips and Elizabeth Lockhart, foreground, cheer on their teammates at the State Championships. Courtesy/LASG


The League of Women Voter’s is holding its Annual Meeting Saturday, April 14 at Bethlehem Evangelical Lutheran Church, 2390 North Rd:
