CONE ZONE: Week of May 6

Public Works Projects
For more information about the projects listed below, please e-mail lacpw@lacnm.us, call 662-8150, or visit the “Projects” link at www.losalamosnm.us. Please slow down and use caution as you travel through these construction areas.

Eastern Area 2 Concrete, Paving & Utility Project – Phase 2
Canyon Road is closed with a “rolling” closure between Rim Road and 15th Street; the closure shifts closer to 15th Street as work on the sewer line progresses. Residential access in the immediate closure area will be provided; all others should seek alternate routes.

Canyon Road traffic between Nugget and Rim Road can expect daytime flagging operations with minor delays. Two-way traffic will be restored in this area in the evenings and weekends when work is not occurring.

Pedestrians are asked to use the sidewalk that remains on the east side of Canyon.

Mesa Public Library Safety Improvements
The roadway in front of the library is closed between the two library parking lots. Handicapped parking access is available from Bathtub Row. Pedestrians are urged to use the provided pedestrian pathways and to watch for construction activity.

Upcoming Construction: Western Area Phase 1
This project includes pavement rehabilitation on 41st, 42nd, 43rd, and 44th Streets off Trinity, including concrete replacement and reconstruction of the sidewalk paths from the above streets to the Western Area Park. Council awarded this project to RMCI at its April 30 meeting. The contract requires start of construction no later than May 29.

Search
LOS ALAMOS

ladailypost.com website support locally by OviNuppi Systems