Kelly Cable To Conduct Road Work At White Rock Smith’s

COMMUNITY News:

Kelly Cable NM LLC is scheduled to conduct road work to install new futurepath and fiber to Smith’s on Sherwood Boulevard and Longview Drive in White Rock. 

Work will take place 8 a.m. to 5 p.m., Jan. 18 through Feb. 3 and a crew will notify the surrounding businesses of sidewalk closures and detours.

Search
LOS ALAMOS

ladailypost.com website support locally by OviNuppi Systems