Please slow down and use caution within the construction work zones. Please note: the information below is based on a schedule provided by the contractors and may change due to weather or other delays.
Bathtub Row Reconstruction Project Updates
The contractor will not be working on Memorial Day.
Construction crews with TLC Plumbing & Utility continue the Bathtub Row Reconstruction Project. Construction hours are 7 a.m. to 5 p.m., Monday through Thursday, with the addition of Fridays and weekends, as needed.
A full road closure on Bathtub Row from Juniper Street to Peach/ Nectar Street, including the intersection of Peach Street and Bathtub Row, is in place to allow for construction activities of the new electrical lines. An additional full road closure on Nectar Street from Bathtub Row and just past 19th Street is in place for the crews to install the new water and electrical lines. Community Field may be accessed from Peach Street only.
Direct questions, concerns or special access needs to the Public Works Department at lacpw@lacnm.us or call 505.662.8150.
DP Road Phase II Reconstruction Project Updates
The contractor will not be working on Memorial Day.
TLC Plumbing & Utility is working 7 a.m. to 5 p.m., Monday through Friday (weather permitting). Parking will continue at designated areas south of Ace Hardware and south of the Los Alamos Fire Training Academy (Station #2). Flaggers will direct traffic during lane closures for crews working in the area.
Construction Operations:
- The installation of the new water meters in front of businesses should be anticipated between CrossFit Gym to the Fire Station.
- Concrete operations will continue as crews install new sidewalks, curbs, and gutters from CrossFit Gym west towards Ace Hardware. Driveway reconstruction and concrete operations in front of businesses should also be anticipated.
- Grading of the roadway will begin between the Fire Station to the CrossFit Gym and will require intermittent lane closures with detours provided.
- Comcast will be on site, relocating communication pedestals and communication lines at various locations between the CrossFit Gym and Fire Station #2.
Direct questions and concerns to the Public Works Department at lacpw@lacnm.us or call 505.662.8150. For additional project details, visit the DP Road Reconstruction Project.
Traffic & Streets Projects:
Los Alamos County Traffic & Streets Division staff manage the projects listed in this section. Please slow down and use caution within the construction work zones. Direct concerns to Traffic and Streets Manager Daniel Blea at 505.663.8112.
Countywide Road Striping Continues
The Traffic and Streets Division will continue stripping various roadways across the County. The project will continue through mid-July.
The public is asked to be mindful of crews and striping equipment, follow all traffic control signs, and avoid driving on the freshly painted stripes.
Asphalt Patching Continues
Weather permitting, crews will patch asphalt sections on Terry Lane and continue until completed. Work hours are 8 a.m. to 5 p.m. daily. A road closure on Terry Lane will detour through Deer Trail. Please be mindful of the crew and equipment.
Sidewalk Closure on 35th Street
Beginning Tuesday, May 27, crews will be repairing sections of sidewalk in the 2400 block of 35th Street. The sidewalk will be closed, and detours will be in place. Work hours are 8 a.m. to 3:30 p.m. daily. Work will continue until it is completed. Please be mindful of the crew and equipment.
Utilities Projects
The County Dept. of Public Utilities (DPU) staff manage the projects listed in this section. Please slow down and use caution within the construction work zones. Contact the Customer Care Center at 505.662.8333, CustomerCare@lacnm.us or visit ladpu.com/Projects.
Trinity Drive Potholing Operations
Survey and Mapping, LLC (SAM) will conduct potholing operations to identify underground utility lines on Trinity Drive between Oppenheimer Drive and Knecht Street. Work hours are 7 a.m. and 4 p.m. daily. Motorists should drive cautiously in that area and observe any traffic controls, including single lane closures for both east- and west-bound traffic as well as reduced speed. Multiple sections of sidewalk along Trinity will be closed. Pedestrians should obey sidewalk closure signs.
LAFD Hydrant Testing Continues
The Los Alamos Fire Department (LAFD) is testing fire hydrants throughout Los Alamos County through Sept. 1. These tests are part of the regular hydrant maintenance program and are conducted jointly with the Los Alamos Department of Public Utilities (DPU). Residents will see LAFD firefighters and vehicles throughout the community releasing water through the hydrants while conducting these tests.
Residents may see some discoloration in their water due to the amount and volume of flowing water after nearby hydrants are tested. If this is the case, residents should run the cold-water spigot located outside their home for a few minutes. This will usually resolve the issue. Residents should also avoid washing laundry until the water runs clear.
Direct questions or concerns about this annual maintenance to the Los Alamos County Customer Care Center at 505.662.8333 or CustomerCare@lacnm.us.
Jemez Mountain Fire Protection Project on West Road and Camp May Road
DPU contractors will construct a new water tank on West Road and install a water pipeline between West Road and Camp May Road up to the Camp May campground. On West Road, work will primarily take place on the shoulder.
Camp May Road will be closed Monday through Thursday for the duration of the project. Trails accessible from Camp May Road will also be closed for hikers, bikers, and other recreationists.
More information on this project can be found here.
Western Area Park Sewer Reconstruction Project
DPU’s contractor, DUB-L-EE Construction, will continue trench work in Western Area Park for a sewer main replacement project. The park will remain open, with work zones and staging areas closed off.
During the project, a staging area at the eastern end of the park, near the entrance from UNM-LA property, will be set up and closed off. The basketball court will also be closed as it will be used to stage heavy equipment to prevent damage to the lawn.
While the work is ongoing, park users may experience limited access to certain park areas, noise disruptions and detours. Park users are asked to respect safety barricades and stay away from work zones. Work will be conducted 8 a.m. to 5 p.m. weekdays.
Los Alamos County appreciates the public’s patience and understanding during this important improvement. For more information, contact DPU Project Manager Casey Aumack at casey.aumack@lacnm.us or 505.663.1830.
Non-County Projects
Los Alamos County does not fund the following construction projects. Updates are included to keep residents informed of potential traffic impacts. Questions should be directed to the parties identified within each description. Please obey all traffic devices and slow down in work zones.
Longview Drive Road Closure and Construction
WR Land Investment, LLC’s work underway on Longview Drive in White Rock will continue through Sept. 11. A road closure will remain in place during the entire project. The project includes demolition of existing buildings, installation of infrastructure, and construction of a new subdivision. The winding road adjacent to Longview Drive will be open during the project. If needed, there is a ‘turnaround’ location on the west side of the road closure. Direct questions or concerns regarding this project to Philip Gurskey at 267.816.0299.
Hill Apartments and Realignment of 35th Street at Trinity Drive (N.M. 502)/Pavilion Construction
Construction activities are almost completed on the south side of Trinity Drive near the new 35th Street intersection. Installation of the Rectangular Rapid-Flashing Beacon (RRFB) at the pedestrian crosswalk will be constructed at a later date. Traffic Control devices will be set up for minor pavement corrections for limited periods to protect the workers, while both eastbound and westbound lanes will remain open.
Motorists and bicyclists will be asked to share the road. Both sidewalks are open.