Cone Zone: Week Of July 13

COUNTY News:

Road Construction Update for July 13.

For more information about the projects listed below, please e-mail lacpw@lacnm.us, call 505.662.8150, or visit the “Projects” link at www.losalamosnm.us. Please slow down and use caution within the construction work zones. Please note the below information is based on a schedule provided by the contractors and may change due to weather or other delays.

Western Area Improvements Phase 3:

  • Roadway and utility work continues on 43rd Street (south) and 44th Street (north) which includes water line tie ends and concrete work. Work will begin on 44th Street (south) Wednesday, July 15 for removals and water line trenching. Roads mentioned above will be closed except for local residents and emergency vehicles.
  • 41st Street on the west side (intersection loop) at Sandia will be closed for sewer line work July 13 and 14.  Residents are to use the east side intersection of the loop for in and out access.
  • Sidewalks from UNM to Sandia are still under construction and closed to pedestrians at this time.

Other Resources:

Construction updates are posted at www.losalamosnm.us each Friday explaining traffic control to be expected for the following week – link to News/The Cone Zone. Or, subscribe to The Cone Zone newsletter and receive automatic traffic updates via e-mail each week – just visit the “Newsletters” link on the home page and click on “The Cone Zone” subscribe box. Project updates are also available via newsletter subscription on the same page – sign up to receive news about projects.

Los Alamos
66°
Fair
7:01am6:47pm MDT
Feels like: 66°F
Wind: 11mph S
Humidity: 20%
Pressure: 30.47"Hg
UV index: 7
ThuFriSat
72/48°F
73/52°F
73/46°F
Previous
Next

ladailypost.com website support locally by OviNuppi Systems

CSTsiteisloaded