Los Alamos National Laboratory announces its application to the New Mexico Environment Department for an air quality permit for the modification of its Technical Area 3 Power Plant facility. The expected date of application submittal to the Air Quality Bureau is March 30, 2018.
 
The exact location for the proposed facility known as Technical Area 3 Power Plant is at TA-3, SM-22 on Diamond Drive in the Los Alamos National Laboratory. The approximate location of this facility is 1 mile south of the intersection of Diamond Drive and Trinity Drive in Los Alamos county.
 
The proposed modification consists of:
  • The construction and installation of a Heat Recovery Steam Generator (HRSG), which will be installed on the exhaust stack of the existing Combustion Gas Turbine Generator.
  • The permanent shut down of three existing boilers that were installed in the 1950’s each rated at a capacity of 178.5 MMBtu/hr and the construction and installation of two new auxiliary boilers each rated at a capacity of 72.3 MMBtu/hr.
  • The project will be constructed using a three phased approach. Phase 1 consists of the construction of the two new auxiliary boilers while the existing boilers continue to operate. Once the auxiliary boilers become operational, two of the three existing boilers will be permanently shut down. One existing boiler will be kept as a hot standby to the auxiliary boilers. Phase 2 consists of upgrading steam and condensate lines throughout TA-3. It is anticipated that there will be no air emissions generated from this phase. Phase 3 consists of the conversion of the site’s existing combustion turbine to a combined heat and power system capable of generating both steam and electricity. The existing boiler being used as a hot standby will be permanently shut down at this point. The TA-3 Power Plant will be used to generate electricity and steam for the Los Alamos National Laboratory. No electricity or steam generated from the plant will be sold commercially. 
 
The estimated maximum quantities of any regulated air contaminant for Phases 1 and 3 will be as follows in pound per hour (pph) and tons per year (tpy). These reported emissions could change slightly during the course of the Department’s review:
 
Phase 1
 
Pollutant
Pounds per hour
Tons per year
Total Suspended Particulates (TSP)
9.5 pph*
7.9 tpy*
PM10
8.2 pph*
7.7 tpy*
PM2.5
7.2 pph*
7.6 tpy*
Sulfur Dioxide (SO2)
18.0 pph*
6.9 tpy*
Nitrogen Oxides (NOx)
47.6 pph*
66.1 tpy*
Carbon Monoxide (CO)
41.5 pph*
85.4 tpy*
Volatile Organic Compounds (VOC)
2.1 pph*
2.7 tpy*
Total sum of all Hazardous Air Pollutants (HAPs)
1.0 pph
1.3 tpy
Toxic Air Pollutant (TAP)
0.2 pph
Green House Gas Emissions as Total CO2e
312584 tpy
 
 
 
 
Phase 3
 
Pollutant:
Pounds per hour
Tons per year
Total Suspended Particulates (TSP)
13.4 pph*
34.7 tpy*
PM10
13.4 pph*
34.7 tpy*
PM2.5
13.4 pph*
34.7 tpy*
Sulfur Dioxide (SO2)
7.7 pph*
5.7 tpy*
Nitrogen Oxides (NOx)
37.7 pph*
69.5 tpy*
Carbon Monoxide (CO)
318.1 pph*
71.4 tpy*
Volatile Organic Compounds (VOC)
38.4 pph*
16.1 tpy*
Total sum of all Hazardous Air Pollutants (HAPs)
0.5 pph
2.1 tpy
Toxic Air Pollutant (TAP)
5.7 pph
Green House Gas Emissions as Total CO2e
264450 tpy
 
Estimated hourly and annual start up, shut down and maintenance emissions have been added per public notice requirements.
 
Phase 3 emissions will replace Phase 1 emissions once Phase 3 becomes operational.
 
The standard and maximum operating schedules will be from 24 hours per day, 7 days a week and a maximum of 52 weeks per year.
 
The operator and owner of the Facility is: Los Alamos National Security, LLC, P.O. Box 1663, MS J978, Los Alamos, New Mexico, 87545, operator of Los Alamos National Laboratory for the U.S. Department of Energy, 3747 West Jemez Road, Los Alamos, NM 87544. Please direct questions for the Laboratory to the Environmental Communication & Public Involvement Office point of contact, Peter Hyde, at 505-667-3792envoutreach@lanl.gov, or Environmental Communication & Public Involvement, P.O. Box 1163, MS K491, Los Alamos, New Mexico 87545.
 
If you have any comments about the construction or operation of this facility, and you want your comments to be made as part of the permit review process, you must submit your comments in writing to this address: Air Quality Bureau; Attention: Kirby Olson, 525 Camino de los Marquez, Suite 1; Santa Fe, New Mexico; 87505-1816; (505).476.43221.800.224.7009;https://www.env.nm.gov/aqb/permit/aqb_draft_permits.html. If you do not want to submit written comments, but have questions about the application, please contact Kirby Olson.  
 
With your comments, please refer to the company name and site name, or send a copy of this notice along with your comments. This information is necessary since the Department may have not yet received the permit application. Please include a legible return mailing address. Once the Department has completed its preliminary review of the application and its air quality impacts, the Department’s notice will be published in the legal section of a newspaper circulated near the facility location.