COUNTY News:
Under contract with the Los Alamos Department of Public Utilities (DPU), GM Emulsion will begin repairs to emergency utility asphalt and concrete cuts that occurred during the winter.
Crews will rotate to various locations throughout White Rock and Los Alamos neighborhoods beginning as soon as Friday, Oct. 22 and continue throughout the month. Some minor traffic delays are expected.
Traffic control equipment, such as signage, barrels and barricades will be erected around the work zones. Flagging operations may be deployed to assist with traffic flow. Crews will work 8 a.m. to 5 p.m. daily.
Most locations slated for repairs are on residential streets and should take less than one day. Traffic impacts should be minimal. Motorists are advised to use caution and pay close attention to signage around the work zone.
Areas scheduled for repairs:
In White Rock:
- 100 block of Kimberly
- 100 block of Bandelier
- 100 block of Grand Canyon
- 300 block of Rover (Northside)
- 100 block of Agate
- 100 block of Azure
- 200 block of Canada Way
- Canada Circle
- 100 Block of Sierra Vista
- 300 block of Kilby
- 100 block of Fort Union
- 100 block of El Moro
In Los Alamos:
- 1200 block of Cheyenne
- 1100 block of San Ildefonso
- 3500 block of Gold Street
- 200 block of DP Road
- 200 block of Barranca Road
Questions or concerns should be directed to the DPU through the Customer Care Center 8 a.m. to 5 p.m. Monday through Friday at 505.662.8333 or CustomerCare@lacnm.us